Shopping Complex Foundation
Commercial Project

Shopping Complex Foundation

A large-scale commercial project requiring over 2 lakh bricks delivered in record time without compromising on quality.

location_on

Location

Mysore, Karnataka

square_foot

Total Area

25,000 sq. ft.

inventory_2

Bricks Supplied

2,00,000+

schedule

Delivery Time

45 Days

Project Overview

A prominent real estate developer in Mysore approached Mounto Bricks for their upcoming 3-floor shopping complex project. The project demanded a massive supply of high-quality bricks delivered on a tight schedule, with zero tolerance for quality variation.

The Requirements

  • 2,00,000+ bricks of consistent quality across the entire supply
  • 6-inch Special Perforated Bricks for external walls (load-bearing)
  • 4-inch Wire Cut Normal Bricks for internal partitions
  • Phased delivery over 45 days synchronized with construction milestones
  • Compressive strength ≥ 75 kg/cm² certified by third-party lab

Our Approach

We dedicated a separate production line to this project, ensuring batch-level consistency. Our quality control team tested samples from every batch for compressive strength, water absorption, and dimensional accuracy. Deliveries were scheduled in 5 phases, with each phase aligned to the construction floor plan.

Results Achieved

100%

On-time delivery across all 5 phases

<2%

Rejection rate (industry avg: 8-10%)

₹12L

Estimated savings on mortar and labor

"Working with Mounto Bricks was seamless. Their phased delivery system matched our construction schedule perfectly. The brick quality was consistent throughout — we had almost zero wastage. They're now our go-to supplier for all projects."

— Mr. Vinay Hegde, Project Manager, VH Constructions